I thought I'd share a new videos I took this weekend. Matt was almost done with tiling the bathroom and he tore his bicep tendon. Sunday, I helped him finish up the tile job. We have a little bit more to go and then have to grout it. By end of the day Tuesday, we should have a bathroom that is 95% completed! HURRAY!!!
We hope to start moving items in this upcoming weekend. So the family room is the next to be prepped & painted.
Here is a photo of the bathroom color pallet. We are going for a spa feeling.
Showing posts with label Bathroom. Show all posts
Showing posts with label Bathroom. Show all posts
07 February 2011
05 January 2011
Lets play catch-up
We are making progress on the bathroom. It's not done yet, but we are getting close!! Our goal is January 11. Cross your fingers.
Bathroom So far...
The living room is almost ready to be painted. I have one little section of bricks to take down, we need to sheet rock part of the wall and then time to clean the walls, prime and paint! Man lots of work ahead of us.
Here are some videos for the past month or so.
Bathroom So far...
- Durarock is down on the floor & tub surround
- Tub area is framed out (tub is sitting in frame)
- Plumbing is at 90% completed
- Matt has become an electrician and did an AWESOME job!
- Main tile picked out and purchased
- Accent Tile Picked out
The living room is almost ready to be painted. I have one little section of bricks to take down, we need to sheet rock part of the wall and then time to clean the walls, prime and paint! Man lots of work ahead of us.
Here are some videos for the past month or so.
07 November 2010
Day, Who knows
Today we spent the entire day demoing the house. From 10am - 4pm, we were ripping down sheet rock, tearing up the floor and taking down faux bricks in the living room. Well they are actually 1/2 a brick.
A video will come soon. Here are some photos:
The faux brick came down on ONE wall. It is a lot of work. We have to take each individual brick down. UGH!


The bathroom from the Master Bedroom. It looks so much bigger in person. It's going to be nice to have that extra space!



Matt at like 4pm. Long day of demo. He may be going crazy at this point.

A video of this day to come soon.
Tasks to come:
- Frame Wall for bathroom
- Take down the ceiling
- Plumbers need to come to move the plumbing
- Sheet rock bathroom
- Install bathtub, toliet, vanity and linen closet.
A video will come soon. Here are some photos:
The faux brick came down on ONE wall. It is a lot of work. We have to take each individual brick down. UGH!
The bathroom from the Master Bedroom. It looks so much bigger in person. It's going to be nice to have that extra space!
Matt at like 4pm. Long day of demo. He may be going crazy at this point.
A video of this day to come soon.
Tasks to come:
- Frame Wall for bathroom
- Take down the ceiling
- Plumbers need to come to move the plumbing
- Sheet rock bathroom
- Install bathtub, toliet, vanity and linen closet.
01 November 2010
More videos
The bathroom is moving ahead. It is gutted. Here are some videos from the house - catching it up.
Video Day 1 - House
Day 2 - Bathroom
Day 3 - Bathroom
Day ?? Bathroom
Bathroom Video
There are more videos. Hopefully to come this week. I hope to get there this weekend and do some demoing too!
Video Day 1 - House
Day 2 - Bathroom
Day 3 - Bathroom
Day ?? Bathroom
Bathroom Video
There are more videos. Hopefully to come this week. I hope to get there this weekend and do some demoing too!
24 October 2010
Demo Photos
We try to take as many photos as possible. Here are a few from the Bathroom Demo from Sunday! We took down the wall from the bathroom to the master bedroom closet.
Here is the wall prior to taking it down. Look at ALL that wood paneling... UGH!
Here is the room with the wall down!
Matt sitting in the bathroom. Taking a quick break.
View from the bedroom into the bathroom. AWESOME tub huh?
Another view of the bathroom through the Master Bedroom.
When we took the wood paneling off...we found these flowers on the sheet rock. We are thinking Kathy put them there when the bathroom was redone last. :) Matt sent photos to his mom to show her.
Here is the wall prior to taking it down. Look at ALL that wood paneling... UGH!
Here is the room with the wall down!
Matt sitting in the bathroom. Taking a quick break.
View from the bedroom into the bathroom. AWESOME tub huh?
Another view of the bathroom through the Master Bedroom.
When we took the wood paneling off...we found these flowers on the sheet rock. We are thinking Kathy put them there when the bathroom was redone last. :) Matt sent photos to his mom to show her.
Toliet Day
Here is a video from Matt from a few days ago and taking out the toliet. He gives you some good advice.
19 October 2010
Bathroom - Recap
I, Lacey, will be doing most the text posting and photo posting. Matt is the video guy. We will be documenting the progress of updating this house through videos & photos. We have already started the process.
What has been done so far....
Currently, the door has been removed (and saved to be resurfaced and reused), the vanity is out, the light fixture above the mirror is gone, the mirror and medicine cabinet is torn out, towel rack is gone, no more toilet paper holder, the molding around the door frame and window have been removed.
What's to come....
Next step, taking down the walls and extending it 2 feet into the master bedroom closet. Now, we are losing the master bedroom closet, BUT we will have a larger bathroom AND we'll have a WALK-IN CLOSET!! Dream, swoon, TG!
Photos and Videos to come this weekend!
Renovation 1: The Bathroom
This house has ONE bathroom. And in bathroom standards today, it is TINY! Sitting on the toilet your knees basically touch the bathtub or if you are taller they do. The bathtub is OLD and blue. We really do have a fear it will fall through the floor. What has been done so far....
Currently, the door has been removed (and saved to be resurfaced and reused), the vanity is out, the light fixture above the mirror is gone, the mirror and medicine cabinet is torn out, towel rack is gone, no more toilet paper holder, the molding around the door frame and window have been removed.
What's to come....
Next step, taking down the walls and extending it 2 feet into the master bedroom closet. Now, we are losing the master bedroom closet, BUT we will have a larger bathroom AND we'll have a WALK-IN CLOSET!! Dream, swoon, TG!
Photos and Videos to come this weekend!
Subscribe to:
Posts (Atom)